PHOTO GALLERY, page 22
Click on photos for larger images. (back to page 4) (back to page 10) (back to page 21) (jump to page 23)
|
| A Few Pictures Showing Work to Prepare the Surface for Installation of Brick Pavers at the New ATT Trailhead in Durham County |
| April 7, 2007 |
 Frank showing a few brick laying skills |
 The first section looks good. |
| On May 5th, we finished preparing the surface, layed down more bedding gravel, and put in a lot more paver bricks. |
 Curt, Frank and one of our
regulars getting it done |
 We hope to finish installing the
pavers on May 19th |
 On May 19th Frank and Curt finished laying down the pavers while Moria and Roy did some needed work to improve drainage |
|
| In late June we added a second section and sealed the joints. |
 This final section is in front of the slab for a future port-a-john |
 We added edge boards and installed
polymeric sand in the joints in both sections |
|