Pictures showing work to constuct a new ramp to access the ATT at Solite Park in Durham. Major funding for this much needed improvement was provided by the Carolina Godiva Track Club from race proceeds from the 2/07 Coach Bubba race that was held on the ATT. TRTC also contributed funding for the project. TRTC volunteers did the ramp design, site clearing, and installation of erosion control fencing.
Final Images Added March 9, 2008
TRTC volunteers doing some necessary clearing
We cut down, cut up and removed over a dozen trees
Installing erosion control fencing
A dozen stumps ready for removal
A lot of fill dirt was brought
in and compacted
Moving soil and shaping the slope
Heavy equipment was needed for spreading and compacting
Compacting crusher run to serve
as a base for the asphalt
Almost ready for the asphalt
All paving in place
Another view of finished ramp
View from the ATT
View of the Park
YES, it has been rolled
In progress
Paving done and closed till it dries.
After final dressing of the edges
All done. Now we need to get
some grass growing quickly