Pictures showing work to constuct a new ramp to access the ATT at Solite Park in Durham. Major funding for this much needed improvement was provided by the Carolina Godiva Track Club from race proceeds from the 2/07 Coach Bubba race that was held on the ATT. TRTC also contributed funding for the project. TRTC volunteers did the ramp design, site clearing, and installation of erosion control fencing.
Final Images Added March 9, 2008



TRTC volunteers doing some
necessary clearing

We cut down, cut up and removed
over a dozen trees

Installing erosion control fencing

A dozen stumps ready for removal

A lot of fill dirt was brought
in and compacted

Moving soil and shaping the slope

Heavy equipment was needed for
spreading and compacting

Compacting crusher run to serve
as a base for the asphalt

Almost ready for the asphalt

All paving in place

Another view of finished ramp

View from the ATT

View of the Park

YES, it has been rolled

In progress

Paving done and closed till it dries.

After final dressing of the edges

All done. Now we need to get
some grass growing quickly