PHOTO GALLERY, page 25

Click on photos for larger images. (back to page 4)
  (back to page 10)   (back to page 24)
  (forward to page 26
Pictures showing work to construct the ATT in Chatham County. The section just south of New Hope Church Road shows the extent of clearing required to construct a 12' wide trail. Clearing to this width involved removal of one row of trees on each side and necessarily the loss of the canopy from these trees for many years. The section north of New Hope Church will be a dual surface trail comprised of a ten foot wide asphalt section and a six foot wide crushed stone section. Construction of this section north of New Hope will require an even wider trail corridor. For some areas construction of this wider corridor will require lowering the trail by 1 to 3 feet, more tree removal, and rebuilding the drainage culverts. As you scroll down this page, you will see a number of images showing progress from September 2008 through mid-October 2009
Images Added September 24 and December 24 2008


View of the ATT showing the
significantly widened trail corridor

A second view of the ATT showing
the significantly widened trail corridor

A third view of the ATT showing
the significantly widened trail corridor

A late December view of the ATT
showing the trail corridor and greatly
expanded culvert

A late December view of the ATT
showing the fully widened and
graded trail almost ready for paving

Please scroll down for later views. 

The top two pictures show clearing and grading done on the ATT just south and north of O'Kelly Chapel Road as of April 9th. These views show the clearing done to support the wide, dual surface trail. The lower four pictures show recent installation of the supports and planking during April 2009.
Images Added April 10, 2009
 

View of the ATT looking south
at O'Kelly crossing

View of the ATT looking north
at O'Kelly crossing

View of the new surface supports
looking north at Northeast Creek

View of surface supports looking south at Northeast Creek
Images Added May 3, 2009

View of Northeast bridge
planking in place as of May 1st

Second view of NE bridge planking
              Images Showing Construction on Panther Creek Bridge Added May 17, 2009

View of Panther Creek bridge
as of May 16th

Panther Creek bridge showing concrete approach as of May 16th
Images Showing Trail, Gate Construction Near New Hope Church Road and O'Kelly Chapel Road and View of The Nearly Complete Bridge at Panther Creek as of late July, 2009

Please scroll down for later views. 


Trail at 7.5 mile mark north of New Hope Church Road

Looking north at crossing with New Hope Church Road showing dual surface trail

Trail looking south at crossing with O'Kelly Chapel Road

Completed Gate on South Side of New Hope Church Road

Panther Creek bridge looking north

Shows fencing at a farm road crossing north of New Hope Church Road

Shows view of bridge over Northeast Creek on July 26th
Images of Northeast Creek Bridge as of August 16, 2009              

Northeast Creek Bridge
looking south

Northeast Creek Bridge
looking north
Images of Northeast Creek Bridge and Nearby ATT as of mid-October, 2009

Users on Northeast Creek Bridge
looking south

ATT North of Northeast Creek Bridge