The initial portion of the ATT bridge over I-40 was installed overnight on April 27-28. I-40 was closed and detoured for about 8 hours and the installation went as planned. See picture of the span above. For other photos and information about the event please see the ATT Construction portion http://www.triangletrails.org/gallery/att of our Gallery and an article in the News and Observer http://www.newsobserver.com/2013/04/28/2856674/midnight-crews-install-american.html