Durham’s contractor, Blythe construction, is dealing with issues relating to completing the bridge and the construction of the short trail section to be built alongside Massey Chapel Road. Durham now projects (weather permitting) that the bridge should be completed by mid to late August and the section along Massey Chapel by the end of September. With these changes to the project’s completion, a new date for the Grand Opening has been set: It will be held on Saturday, October 12, 2013, from 9 a.m. – 11 a.m. at the Streets of Southpoint, 6910 Fayetteville St. in the Parking Lot Behind Southpoint Cinemas. See PDF showing the designated area: http://www.triangletrails.org/pdfs/SetUpMap.pdf
Planning for this event is continuing and will include short presentations by Durham’s Mayor Bill Bell, Congressman David Price and others who have had a role in building and requesting funds for Phase E. Refreshments and information tables are planned as well as trail walks and bicycle rides (weather permitting). Check back here in September for more details on specific activities.